NOTIFICATION:
Solicitations are provided on this page for information purposes only. All RFP’s and IFB’s that are required to be publicly posted are posted on Rocky Mountain E-Purchasing System. RFP’s and IFB’s provided on this page may or may not be up to date, and may or may not include required amendments or addenda. Failure of an Offeror to comply with provisions of an RFP, IFB, addendum/amendment due to anything provided, or not provided, on this page, will not be excused by the City of Colorado Springs. The RFP’s or IFB’s included on Rocky Mountain E-Purchasing System and Bonfire Interactive Procurement Portal remain the authoritative and valid version for procurement purposes.
Not all open RFP’s and IFB’s are listed yet.
Open RFPs and IFBs
On-Call Forestry Maintenance
Cimarron & I25 Interchange Landscape Maintenance Services
Snyder Quarry Reclamation
CSPD Pre-Engineered Storage Building Design and Construction Services
ITSM Replacement Project (ServiceNow) Implementation
Greenways Park Pedestrian Bridge Purchase RFQ
North Nevada East Side Stormwater Improvements
Sand Creek Pond 2 Improvement Project
Gray Hawk Park Playground Design and Installation
Vehicle and Equipment Up-Fitting Services
Benches and Trash Cans for OCC
Erosion Repairs for Airport Rental Car Outlet
Crack Sealing Services
Cost Share Concrete Repair
Park System Master Plan
Wasson Park ADA Concrete Sidewalks
Tejon St. Revitalization Construction Management Services
Parks Gate & Restroom Locking
Stetson Hills Paving Project
Valley Hi Channel Conversion
Construction Management for 8th Street
Housing Needs Assessment
CSPD Soft Body Armor and Load Bearing Vest Carrier
Irrigation System Improvements at Evergreen Cemetery
Westside Community Center Design-Build Project
Edge Lit Traffic Control Signs
Old Colorado City (OCC) Parking Lot Signage
Repave & Repair the Asphalt Parking Lot At Fire Department Logistics and Transportation Center (LTC)
Barnes Outfall Pond
Fillmore St and Bridge Improvements and Trail Connections I-25 to Monument Creek
East Terminal Upgrades for COS Airport (CMAR)
On-Call Executive Recruiting Services
Marksheffel and Zircon Design Services
Parking and Curb Management Plan
Pipe lining for Farnsworth Dr.
ADA Complementary Paratransit Services
- R23-157PB RFP
- Addendum 01
- Addendum 02
- Addendum 03
- Addendum 04
- Liquidated Damages - Additional
- Safety & Security Incident Report
- F-30 Template for NTD Reporting
- Contractor Staffing
- 5 years of Para Utilities history
- October 2023 Phone Logs
- Eligibility
- Eligibility 36 months
- Guide-to-ride
- Evaluation Form
- OTP
- Replacement schedule
- Taxi trips 2019-2023
- Paratransit Productivity
- Miles and Hours 2023
- LDs 2022-2023
- 12 Months of Invoices
- Part D Route Productivity report
- Parts ABCDEF - Trip information
- 12 Months Utilities 1070, 1161 and 1165
- 2023 facilities maintenance schedule PDF
- Facilities Maintenance Schedule
- Service Standards
- Travel Training